Howe-Woods
Technical Services Proven Design Engineering Capabilities for the support of
following on going projects...
 |
Crane
Nuclear, Inc.
|
Currently HWTS is on contract
with Crane Nuclear, Inc. in Bolingbrook, Illinois to provide analytical support
for valves that are installed in various power plants. This support includes, but not limited to, the Seismic and
Weak-link Analysis of motor operated valves located in various nuclear plants.
Some of the major plants are the Duke Energy Occonne Plant and Carolina
Power & Light Shearon Harris power plants.
 |
Itasca
Power Company
|
HWTS is providing design
engineering support for the piping and other mechanical systems of Itasca Power
Company=s 15MW biomass power
plant that is being constructed in Northome Minnesota.
This will consist on an evaluation of the proposed designs for the main
steam, feed-water, condensate and heating plant piping systems to insure that
they meet the design requirements of ASME B31.1 power piping.
The activity also includes the design layouts of the piping systems and
providing detail drawings for construction.
 |
Chicago
O'hare
International Airport
|
HWTS provided engineering
technical support for the upgrade of the O'Hare International Heating and
Refrigeration piping system. This
consisted of design analysis and review of the proposed modifications to the
High Temperature Water Piping located in the underground utility ring tunnel.
 |
Illinois
Department of Transportation District #3 |
Headquarter
Heating
Boiler Replacement
HWTS provided the
design-engineering for the replacement of the heating boilers at the Illinois
Department of Transportation District #3 Headquarters in Ottawa, Illinois.
This consisted of an evaluation of the existing physical heating plants
and preparing detail drawings plus specifications for there replacement.
The existing two heating boilers were replaced with smaller high
efficiency modular type of boilers.
 |
Naval
Air Warfare Center
|
HWTS provided design
engineering for the support system of the high pressure air piping on one of the
test set-ups at the Naval Air Warfare Center in China Lake California.
This consisted of an evaluation of the existing supports and proposed
design changes to meet the specified high pressure and flow conditions. The
activity included the design and layout of the piping system.
It also provided detail drawings for construction.
|